Georgia twinning:
Strengthening capacities of GNERC in updating incentive-based electricity tariff methodology

Executive Summary

The twinning project with the Georgian National Energy and Water Supply Regulatory Commission (GNERC) started in 23.9.2012  and ended on the 22.6.2014. The EU budget provided was € 1.100,000.

The objectives were

  • to update the incentive based electricity tariff regulation and prepare conditions for its initial implementation.
  • GNERC has started working on a new, incentive-based tariff methodology some time ago and a draft methodology has been prepared. However, it is considered as incomplete and GNERC decided to bring it up to date and complete it with the support of knowledge and experience of European Regulators. Considerable capacity building will accompany the main aim.

Partners

Team

Dietmar Preinstorfer
Project leader, E-Control Austria
Gocha Shonia
BC project leader, GNERC
Eszter Süle
Resident twinning advisor, E-Control Austria
Nugzar Beridze
RTA counterpart, GNERC
Nino Nikoleishvili
RTA assistant, E-Control Austria
Elena Gabedava
Project translator/interpreter, E-Control Austria

The final conference

Images

Documents

Press Release EU strengthens capacity of Georgian energy regulator

Project Start

(Filesize: MB)

Press Release Project Start

English

(Filesize: MB)

Press Release Project Start

Georgian

(Filesize: MB)

Leaflet European Union's Twinning Programme for Georgia

Project Start

(Filesize: MB)

Leaflet European Union - Project Components

Project Start

(Filesize: MB)

Leaflet European Union Georgian

Project Start

(Filesize: MB)

Leaflet European Union Georgian

Project Start

(Filesize: MB)

Energy market opening in Austria and future challenges for the Internal Energy Market

Martin Graf, Opening Event

(Filesize: MB)

Strengthening capacities of the Georgian National Energy and Water Supply Regulatory Commission (GNERC) in updating incentive based electricity tariff methodology

Dietmar Preinstorfer, Opening Event

(Filesize: MB)

Speech Mr. Gocha Shonia

Kick-Off

(Filesize: MB)

Speech Mr. Guram Chalagashvili

Kick-Off

(Filesize: MB)

Press Release

Georgian

(Filesize: MB)

Press Release Plans for new calculation of electricity network tariffs for Georgian consumers - English

Conference

(Filesize: MB)

Press Release Plans for new calculation of electricity network tariffs for Georgian consumers - Georgian

Conference

(Filesize: MB)

The European Union supports the Georgian energy regulator - English

Roundtable at the Energy and Water Supply Regulatory Commission (GNERC)

(Filesize: MB)

The European Union supports the Georgian energy regulator - Georgian

Roundtable at the Energy and Water Supply Regulatory Commission (GNERC)

(Filesize: MB)

Agenda for the Final Conference of the Twinning Project

Closing

(Filesize: MB)

Booklet European Union, Austria and Georgia: Twinning for Updating the Electricity Tariff Methodology - English

Closing

(Filesize: MB)

Booklet European Union, Austria and Georgia: Twinning for Updating the Electricity Tariff Methodology - Georgian

(Filesize: MB)

Invitation Final Conference

Closing

(Filesize: MB)

EU support for cost reflective electricity network tariffs for Georgian consumers

Press release English - after final conference

(Filesize: MB)

EU support for cost reflective electricity network tariffs for Georgian consumers

Press Release Georgian - after final conference

(Filesize: MB)

Press Release before Final Conference - English

Closing

(Filesize: MB)

Press Release before Final Conference - Georgian

Closing

(Filesize: MB)

Timeline